SP - SSA International Terminal, Cai Mep

  • 2009 – 2011 – Electrical design and construction support of the container yard and berth.
    Including capacity for handling:
    • 4 STS Super Post Panamax cranes
    • 20 ERTG 7 containers wide, 6 containers high
    • 288 reefer outlets
    • Buildings
    • 22KV substation
    • 3.3KV substation
    • Underground Medium and Low Voltage/communications infrastructure Sea Water
    • Firefighting pump
    • Pre-Trip Area
    • Back Bone infrastructure for Fiber Optics system
    • 8 MVA Generator Power Plant
  • 2017 – Construction support for final implementation of electrical system.