Projects
in Vietnam
SP - SSA International Terminal, Cai Mep
- 2009 – 2011 – Electrical design and construction support of the container yard and berth.
Including capacity for handling: -
- 4 STS Super Post Panamax cranes
- 20 ERTG 7 containers wide, 6 containers high
- 288 reefer outlets
- Buildings
- 22KV substation
- 3.3KV substation
- Underground Medium and Low Voltage/communications infrastructure Sea Water
- Firefighting pump
- Pre-Trip Area
- Back Bone infrastructure for Fiber Optics system
- 8 MVA Generator Power Plant
- 2017 – Construction support for final implementation of electrical system.