Santa Marta International Container Terminal

  • 2007 – Early Operation. Electrical design,  and fabrication, preparation of components for the development of 144 reefer outlets.
  • 2008 – 9 – Electrical design of the container terminal redevelopment  with capacity  for handling  2 STS cranes, 4 ERTGs,  720 reefer outlets,  9  45m high mast poles, underground  Medium  and  Low Voltage/communications infrastructure,  1 13.2KV substation and a 4.16KV substation.
  • 2009 – 11 – Construction support for the electrical system.