Santa Marta International Container Terminal
- 2007 – Early Operation. Electrical design, and fabrication, preparation of components for the development of 144 reefer outlets.
- 2008 – 9 – Electrical design of the container terminal redevelopment with capacity for handling 2 STS cranes, 4 ERTGs, 720 reefer outlets, 9 45m high mast poles, underground Medium and Low Voltage/communications infrastructure, 1 13.2KV substation and a 4.16KV substation.
- 2009 – 11 – Construction support for the electrical system.