2016-2017 – Electrical design review and construction support of the container yard as Berger Abam Subcontractor. Including capacity for handling:

  • 8 STS Super Post Panamax cranes,  
  • 12 RMG 10 containers wide, 6 containers high
  • +1500 reefer outlets
  • Illumination design
  • Buildings
  • 12KV substations
  • Underground Medium and Low Voltage/communications infrastructure
  • Back Bone infrastructure for Fiber Optics system
  • 5 MVA Generator Power Plant
  • 44KV 16MVA substation

2022 – Design and specification for the electrical infrastructure of new reefer outlets (400+ units).