PSA Panama International Terminal S.A.
2016-2017 – Electrical design review and construction support of the container yard as Berger Abam Subcontractor. Including capacity for handling:
- 8 STS Super Post Panamax cranes,
- 12 RMG 10 containers wide, 6 containers high
- +1500 reefer outlets
- Illumination design
- Buildings
- 12KV substations
- Underground Medium and Low Voltage/communications infrastructure
- Back Bone infrastructure for Fiber Optics system
- 5 MVA Generator Power Plant
- 44KV 16MVA substation
2022 – Design and specification for the electrical infrastructure of new reefer outlets (400+ units).