ITSA News
First Fishing Tournament for Boats and Kayaks
2018
Learn about everything we experienced in the First Kayaks and Boats Fishing Tournament in Playa Langosta, in Colon Province.
We had the participation of a large number of participants who lived this experience full of prizes and good family fun to the fullest.
ITSA concludes expansion project for 192 Reefers connections at MIT (Manzanillo International Terminal.
2021
ITSA participates in the electrical modifications to 6 STS cranes to increase their height.
2021
ITSA participates as an electrical consultant in the modifications required in the TPT to receive ships of refined petroleum products.
2021
ITSA expands its activities to include the supply of port equipment operators at MIT.
2019
ITSA completes replacement of high pressure sodium lamps for modern LED lamps with high light output per watt.
2019
New Manzanillo substation allows MIT to be prepared to meet the energy demands of its present and future industrial activities.
2017
ITSA Completes the installation of high-rise poles. Poles will be used for lighting and communications with yard equipment.
2012
ITSA staff available for crane repair 24/7.
2005