Projects

in Ecuador

Puerto Bolivar

2022-2024 – Peer Review (Independent Check Engineer) for the electrical development of the maritime terminal. The review included:

  • Underground Medium, Low Voltage and communications infrastructure
  • Substation Design
  • Building power
  • Illumination design
  • CCTV
  • Back Up Generation
  • Fuel System
  • Grounding system
  • Substations