2016-2017 –Electrical design review and construction support of the container yard as Berger Abam Subcontractor. Including capacity for handling:

  • 8 STS Super Post Panamax cranes,  
  • 12 RMG 10, 6 high
  • +7500 reefer outlets
  • Illumination design
  • Buildings
  • 12KV substations
  • Underground Medium and Low Voltage/communications infrastructure
  • Back Bone infrastructure for Fiber Optics system
  • 5 MVA Generator Power Plant
  • 44KV 16MVA substation