2003-2008
- 2003 - Design and construction of the electrical system for 72 reefer plugs
- 2003- 2012 Supply of labor for maintenance activities of the terminal electrical, plumbing, mechanical, and civil works (yard and berth)
- 2004 - Design and construction of Medium Voltage Network including 2 substations, 960 reefer plugs, power and fiber optics connections for 8 STS Post Panamax Hyundai cranes.
- 2005 - Crane Retro fit of 8 STS diesel powered cranes to electrical system (MV Network and substation)
- 2006 – Design and construction of electrical system of the administration building. Includes 12,000 m2 of office space, 800 tons of chilled water capacity, back up generation power, redundant transformer system, and fiber optics communications infrastructure.
- 2007 - Electrical system for 3 STS Post Panamax and 3 STS super Post Panamax ZPMC Cranes.
- 2007 – Electrical design and construction support of MIT logistic Park, warehouse are composed of 100,000m2 of warehouse space.
- 2008 – Electrical design and construction support of Berth 1 container yard, including High mast lighting
- 2008 – Installation of 6 180ft hybrid towers for illumination and wifi communications.
- 2008 - Installation of DGPS equipment on RTG, Side Picks, and Top Pick yard equipment.
|
|