2003-2008
    • 2003 - Design and construction of  the electrical system for 72 reefer plugs
    • 2003- 2012 Supply of labor for maintenance activities of the terminal electrical, plumbing, mechanical,  and  civil  works  (yard and berth)
    • 2004 - Design and construction of Medium Voltage Network including 2 substations, 960 reefer plugs,  power and fiber optics connections for 8 STS Post Panamax  Hyundai cranes.
    • 2005 -  Crane Retro fit of  8 STS diesel powered cranes to electrical system (MV Network and substation)
    • 2006 – Design and construction of electrical system of the administration building.  Includes 12,000 m2 of office space, 800 tons of chilled water capacity, back up generation power, redundant transformer system,  and fiber optics communications infrastructure.
    • 2007 - Electrical system for 3 STS Post Panamax and 3 STS super Post Panamax  ZPMC Cranes.
    • 2007 – Electrical design and construction support of MIT logistic Park, warehouse are composed of 100,000m2 of warehouse space.
    • 2008 – Electrical design and construction support of Berth 1 container yard, including High mast lighting
    • 2008 – Installation of 6 180ft  hybrid towers for illumination and wifi communications.
    • 2008 -  Installation of DGPS equipment on RTG, Side Picks, and Top Pick yard equipment.

     

2009 - 2017
  • 2009 -  Electrical design and construction of the Container Yard realignment  (Yards C6 to F8)
  • 2010 – Electrical design and construction of the salt water firefighting system and roro yards.
  • 2011 - Electrical design and construction of the expansion system at 4.16KV for the ERTG conversion of 16 machines. Including two substations
  • 2012 – Electrical design for the expansion of 3 new berths and container yards.
  • 2012 - Electric design and construction of the expansion of the STS crane substation,  3 Km of  duct banks,  connection and energization of 2 Post Panamax and 1 Super Post Panamax STS cranes.
  • 2013 -   ASC Electrical Distribution
  • 2014-5 -   Berth 8 Electrical Design and Installation.
  • 2016-7-    90MVA Power barge business development negotiation and management of 115KV substation implementation.